CONSTRUCTION of self-discharging CONTAINERS set – DUMP box

Our company designs and manufactures sets of self-unloading containers – DUMP BOX. These kits improve the process of handling bulk cargo and are tailored to the needs and infrastructure of the client. In the video below, a set that can discharge one truck set weighing up to 24T with one crane operation.

07.05.2020

REPAIR OF THE LIEBHERR’s 550 CRANE main TRANSMISSION gear

We have just completed the repeair of the only Liebherr 550 crane in Poland. A complete overhaul of the main transmission gear was required to obtain the TDT certificate. After disassembly and verification of the gears in the workshop, we changed gears, bearings, seals and made adjustments. In addition, we reviewed and replaced the seals of four high-pressure oil pumps. The renovation was carried out for Hes Gdynia Bulk Terminal, Liebherr 550 is the largest mobile crane used by this company and has a lifting capacity of 124 tons.

JORVIK

The JORVIK vessel ended up in the shipyard after being aground. Ship repair consisted of prefabricating the central part of the inner and outer bottom and assembling it in the hull.

SCRABBER

We have installed scrabbers on a series of twin Finnish vessels. The repairs started with the construction and assembly of the foundations on the vessel. Then, we trasported and assembled the previously prepared scrabber. At the final stage, we rebuilt the existing funnel to adapt it to the new structure.

HAVLA PHOENIX

In order to extend the Havla Phoenix vessel it needed to be cut by us. Then we preapred and installed a previously prepared cylindrical insert in the hull.

KOMMANDOR CALUM 

We participated in the conversion of a cable-type unit into a hydrological unit. Our tanks included rebuilding the stem, making a bathyscaphe moonpool, rebuilding the wheelhouse, removing the foundations and cable winch lifts and then making the foundation and installing a side winch. 

DIVERS BASE 

In order to adapt the seagoing, two-masted yacht to the diving base, we have built and installed a new stern basket of the vessel.

DRY DOCK GATE 

During the renovation of the dry dock, we dismantled the gate, replaced the seals and replaced the valves. 

JAS 51 

In the oldest Polish floating cutter, JAS 51, we made inserts in the hull to remove any leaks.